News

Charlotte condo site 1024 768 BLTA

Charlotte condo site

Views of Charlotte construction site.

Progress of Dorchester Apartments Site 1024 683 BLTA

Progress of Dorchester Apartments Site

Views of the Dorchester Apartments construction site.

A public work of art created by Montreal artist Ianick Raymond to be installed on the new Maison de Radio-Canada 1024 576 BLTA

A public work of art created by Montreal artist Ianick Raymond to be installed on the new Maison de Radio-Canada

A public work of art created by Montreal artist Ianick Raymond will be installed on the wall of Studio A of the new Maison de Radio-Canada. The work of art, titled Résonance des lieux, will be installed on the wall of Studio A, the largest studio of the new Maison de Radio-Canada, located along Alexandre-DeSève Street and adjacent to the Place Radio-Canada public space.
Chosen following a privately-run contest initiated by Broccolini on which BLTA actively participated, Raymond’s proposal won the jury over thanks to the quality of its artistic approach and its harmonious integration with the theme it is meant to celebrate – the neighbourhood’s history and community life.

For more information: Communiqué de presse, click here.

More about the history of Maison Lacroix.

First broadcast from the new Maison de Radio-Canada! 900 657 BLTA

First broadcast from the new Maison de Radio-Canada!

On August 24, 2020, the radio program L’heure du monde had the privilege of being the very first broadcast from the new Maison de Radio-Canada.

Click here to see pictures of the radio show going on air and hear host Jean-Sébastien Bernatchez’s interview with Michel Bissonnette, Vice-President of French Services at Radio-Canada.

Progress of Tour des Canadiens 3 Construction Site 900 675 BLTA

Progress of Tour des Canadiens 3 Construction Site

Site views of Tour des Canadiens 3.

L/Avenue wins an American Concrete Institute Excellence Award 900 510 BLTA

L/Avenue wins an American Concrete Institute Excellence Award

L/Avenue won an award in the High-Rise Structures category during the first edition of the Excellence in Concrete Construction Awards hosted by the Quebec and Eastern Ontario chapter of the American Concrete institute.

The project will be representing the local chapter for the ACI Excellence Gala which will be held in North Carolina in October 2020.

aciquebec.com

Award for Excellence in Steel Construction for the new Maison de Radio-Canada 900 510 BLTA

Award for Excellence in Steel Construction for the new Maison de Radio-Canada

The Quebec chapter of the Canadian Institute of Steel Construction (CISC-ICCA) annually recognizes Quebec teams for their outstanding achievements in steel construction.

The new Maison de Radio-Canada won the 2019 Steel Award for Excellence in Steel Construction in the Commercial Buildings category.

Excavation at the Victoria sur le Parc site 1024 683 BLTA

Excavation at the Victoria sur le Parc site

Impressive excavation on the site of the future residential project Victoria sur le parc !

Five basement levels are dug under the future 58-stories tower. The project also includes an underground tunnel to Place Victoria to connect Victoria sur le Parc to the underground network in Montreal.

Hôtel William Gray winner of an Excellence Award 960 640 BLTA

Hôtel William Gray winner of an Excellence Award

The Hôtel William Gray won an Excellence Award in the Heritage Preservation category at the 30th Prix d’excellence en Architecture presented by the Ordre des architectes du Québec (OAQ). The winning projects were announced during a gala that took place on Friday, April 5th, 2019.

We share this honor with our client, the Antonopoulos Group, with the BLTA project team, and with the professionals and consultants who contributed to this unique project.

+ Voir sur vimeo

Start of construction for Victoria sur le Parc 1024 576 BLTA

Start of construction for Victoria sur le Parc

Broccolini started the construction of its mixed-use project, including and Victoria sur le Parc, a residential tower, and an office podium, Le 700 St-Jacques.

The project is scheduled to be completed in fall 2023.

Join our Newsletter

We'll send you newsletters with news, tips & tricks. No spams here.

Contact Us

We'll send you newsletters with news, tips & tricks. No spams here.